Conservation Architects logo

Looking to the Future, Caring for the Past

St James Church, Leckhampstead - Grade II*

To play, press and hold the enter key. To stop, release the enter key.

4638021373
press to zoom
4638021348
press to zoom
4638021369
press to zoom
4638021356
press to zoom
4638021341
press to zoom
4638021358
press to zoom
4638021340
press to zoom
4638021359
press to zoom
4638021343
press to zoom
4638021363
press to zoom
4638021349
press to zoom
4638021368
press to zoom
4638021354
press to zoom
4638021361
press to zoom
4638021346
press to zoom
4638021352
press to zoom
4638021365
press to zoom
4638021364
press to zoom
4638021353
press to zoom
4638021357
press to zoom
4638021350
press to zoom
4638021342
press to zoom
4638021347
press to zoom
4638021367
press to zoom
4638021362
press to zoom
4638021373
press to zoom
4638021348
press to zoom
4638021369
press to zoom
4638021356
press to zoom
4638021373
press to zoom
4638021348
press to zoom
4638021369
press to zoom
4638021356
press to zoom
4638021341
press to zoom
4638021358
press to zoom
4638021340
press to zoom
4638021359
press to zoom
4638021343
press to zoom
4638021363
press to zoom
4638021349
press to zoom
4638021368
press to zoom
4638021354
press to zoom
4638021361
press to zoom
4638021346
press to zoom
4638021352
press to zoom
4638021365
press to zoom
4638021364
press to zoom
4638021353
press to zoom
4638021357
press to zoom
4638021350
press to zoom
4638021342
press to zoom
4638021347
press to zoom
4638021367
press to zoom
4638021362
press to zoom
4638021373
press to zoom
4638021348
press to zoom
4638021369
press to zoom
4638021356
press to zoom
4638021370

Before work began

4638021360

After completion of the project

St James Church was placed on the Historic England Heritage at Risk Register, as a Priority A building, due to the poor state of the roof, and structural movement caused by spreading of the roof. In addition to this, the trusses supporting the integrated tower were starting to fail and the whole roof was at risk of collapse. Many roof tiles had fallen to the ground, were broken or chipped, and the internal fibreboard (inserted during the 1949 roof repair) had drastically deteriorated due to moisture resulting from leaks, and water vapour from gas heaters. The rate of decay put the future of the building at risk.


The Victorian church, designed by Samuel Teulon, is of brick and flint construction and a large clay tile roof. Though re-roofed in 1949, many tiles were reused providing a reference to the original. In order to preserve the aesthetic quality of the roof, handmade Tudor Roof Tiles were chosen as the closest match to the original. Small battens had been used and were starting to fail, so these were replaced with a larger size batten to increase the longevity of the roof.


The original lath and plaster ceiling had previously been removed, possibly in the 1949 re-roofing, and replaced with un-painted fibreboard. As the original ceiling had already been removed, rather than replace it with new lath and plaster, Steico SDW sarking board was chosen to add better insulating properties to the new roof. This breathable, natural fibre insulation board is eco-friendly and compatible with the lime plaster used internally. It was then finished in white Earthbourne clay paint.


In order to prevent further spreading of the roof, it was necessary to insert four, evenly-spaced, roof ties. A simple design was chosen in black to complement the variegated brick interior of the building.